
Landscaping and construction in Callander
Edwards Landscape & Construction is a North Bay contractor serving Callander, minutes south on Highway 11. Projects run $2,000 to $50,000 depending on scope, quoted in writing after an on-site visit. Callander is the one community here that sits in Parry Sound District rather than Nipissing, and the North Bay-Mattawa Conservation Authority issues both its septic and its shoreline permits, which surprises most homeowners.
Callander vs North Bay: what changes on a Callander build
Edwards Landscape & Construction builds the same five services in both places. These are the parts that are not the same.
| Factor | North Bay | Callander |
|---|---|---|
| District | Nipissing | Parry Sound, despite the North Bay conservation authority |
| Water and sewer | Municipal across most of the city | Urban service area only, roughly 780 properties |
| Septic permits | Conservation authority | Conservation authority, plus a municipal pump-out by-law |
| Regrading and retaining walls | CA permit near regulated areas | CA permit, and the CA names hardscape explicitly |
| Shoreline | CA regulated area | Vegetation preserved within 20 m; no blasting or filling to create land |
| Buried hazards | City services | Two high pressure gas pipelines cross the municipality |
Callander is in Parry Sound District
Worth getting right, because it is counterintuitive. Callander is a municipality in Parry Sound District, not Nipissing, and it is the northernmost municipality in that district and part of the Almaguin Highlands. It borders North Bay to the north.
The district is a census and territorial division, not a permitting authority, so it does not change who issues a building permit. Callander has its own chief building official. What it does mean is that Callander straddles two worlds: Parry Sound District geography with North Bay area regulatory infrastructure, because the municipality is a member of the North Bay-Mattawa Conservation Authority.
The conservation authority permits ordinary landscaping
This is the single most useful thing for a Callander homeowner to know. The conservation authority's own list of activities requiring a permit includes placing or excavating fill, installing a culvert, building a shoreline breakwall, and, in its own words, landscaping which includes filling, re-grading and adding hardscape or retaining walls. Decks, pools, sheds, garages and driveways are on the list too.
Regulated areas cover shoreline, flood and erosion hazard land, river and stream valleys, wetlands, and everything within 30 metres of a wetland. Callander has a 319 hectare provincially significant wetland on the bay. A great deal of routine landscaping work in Callander needs a permit, and most people find that out late.
Callander Bay is over capacity, and the rules show it
The municipality's own official plan states that Callander Bay is considered over capacity from a biological water quality perspective, and the rules that follow are unusually strict.
New tile fields must sit at least 300 metres back from the shoreline of Callander Bay and the Wasi River, unless a site-specific soils investigation by a qualified professional proves the ground will retain phosphorus. Septic systems generally must be at least 30 metres from the high water mark. Existing natural shoreline vegetation has to be preserved within 20 metres of the shoreline, apart from hazardous trees and a narrow path to the water. And the plan states directly that creating buildable land by blasting or filling the natural landscape, or dredging the lake bottom, is not permitted.
On top of that, anything within 120 metres of water draining into Callander Bay falls in an issue contributing area with mandatory septic inspections every five years.
Most of Callander is on well and septic
Municipal water and wastewater stop at the urban service area. Roughly 780 homes and businesses are connected; everything outside, including most of the rural south shore and much of the waterfront, is on a private well and a private septic system. The municipality also runs its own pump-out by-law requiring proof of a septic pump-out every three years for permanent residents and five for seasonal.
Callander is also frank about what does not need a building permit, which is helpful: landscaping including sidewalks and driveways, decks less than 600 mm above grade that need no guards, and accessory structures under 10 square metres are exempt, though zoning still applies. Note the building department keeps limited hours, Mondays, Wednesdays and Fridays.
One detail that catches people at the end of a build: the final inspection covers construction being complete inside and out including site grading. The landscaping is part of closing the permit.
Two gas pipelines cross the municipality
This one is a genuine safety and liability item rather than a paperwork nuisance. The official plan records that TransCanada operates two high pressure natural gas pipelines within rights-of-way crossing the municipality. Approval is required for any activity on or within 30 metres of the right-of-way, specifically including excavation, blasting and the movement of heavy equipment. A seven metre setback applies to all permanent structures and excavations from the limits of the right-of-way, and early consultation is required for development within 200 metres.
Locating services before digging is standard practice everywhere. In Callander it is not optional.
How much does landscaping cost in Callander in 2026
Edwards Landscape & Construction projects run between $2,000 and $50,000 depending on scope. In Callander the swing factor is usually approvals rather than ground. A straightforward back garden moves quickly. Anything near the bay, a stream or a wetland picks up a conservation authority permit, and waterfront lots carry vegetation and septic setbacks that shape the design before it starts. Every quote is fixed and in writing after an on-site visit, with site conditions flagged before the number is given. Edwards Landscape & Construction holds a 5.0 rating across 20 Google reviews and backs every build with a 3-year workmanship warranty.
Where to find a landscaping and construction contractor near you in Callander
Edwards Landscape & Construction covers Callander and the shoreline around Callander Bay. The municipality has grown 2.6 percent to 3,964 people, with about 1,758 dwellings of which roughly 7 percent are seasonal, so this is a mostly year-round community with a real waterfront market attached to it.
Development pressure here is overwhelmingly shoreline, which the official plan states outright, and many older waterfront dwellings were built for seasonal use on septic systems that predate current standards. Converting one to year-round living is treated as new residential development.
- The village core, Main Street North, Lansdowne Street and the municipal dock.
- Callander Bay shoreline, the eastern shore and the bay's waterfront lots.
- The south shore, Highway 654 west, including Wisawasa and Lighthouse Beach.
- Wasi Road and Wasi Falls Road, the Wasi River corridor inland.
- Cranberry Road, and the rural properties east of the village.
What Edwards builds in Callander
All five services, adapted to what Callander ground and Callander approvals require.
- Landscaping: grading, sod and seed, garden beds, planting, and property restoration.
- Hardscaping: interlock driveways, paver patios, walkways, steps, and retaining walls built for freeze-thaw.
- Excavation and drainage: site prep, foundations, French drains, and grading that moves water away from the building.
- Home renovations: interior and exterior work, decks, and additions.
- Construction: full builds and structural work, with permits and trades coordinated by one contractor.
Callander is one of nine areas on the full Edwards service area list, which sets out what changes from one community to the next.
Callander questions, answered
Is Callander in Nipissing District?
No. Callander is in Parry Sound District, and it is the northernmost municipality in that district. It does still fall under the North Bay-Mattawa Conservation Authority, which is a Nipissing-centred body, so Callander sits in Parry Sound District geography with North Bay area regulatory infrastructure. The district itself does not issue building permits; Callander has its own chief building official.
Do I need a permit to build a retaining wall in Callander?
Very likely, if it is anywhere near water or a wetland. The conservation authority's own list of permit-triggering work names landscaping that includes filling, re-grading and adding hardscape or retaining walls. Its regulated area covers shoreline, flood and erosion hazard land, valleys, wetlands and everything within 30 metres of a wetland.
Why are the septic rules so strict near Callander Bay?
Because the bay is officially considered over capacity for phosphorus. New tile fields must be set back 300 metres from the shoreline of Callander Bay and the Wasi River unless a soils study proves the ground retains phosphorus, septic systems must generally be 30 metres from the high water mark, and anything within 120 metres of water draining into the bay faces mandatory septic inspections every five years.
Does Callander have municipal water and sewer?
Only inside the urban service area, which covers roughly 780 homes and businesses. Everything outside it, including most of the rural south shore and much of the waterfront, is on a private well and septic system. The municipality also requires proof of a septic pump-out every three years for permanent residents and five for seasonal ones.
How much does landscaping cost in Callander in 2026?
Most Edwards Landscape & Construction projects run between $2,000 and $50,000 depending on scope. In Callander the cost driver is more often approvals than ground: work near the bay, a stream or a wetland picks up a conservation authority permit, and waterfront lots carry vegetation and septic setbacks that shape the design. Every quote is fixed and in writing after an on-site visit.
Rated 5.0 across 20 Google reviews
Kayden did an amazing job on our home renovation! He painted our home and updated our kitchen cabinets, and everything turned out beautifully. He was friendly, professional, and took great pride in his work. I would definitely recommend him to anyone looking for quality work!
The guys did a great job. Very happy with the end result. Highly recommend. Hard workers!
I'm very proud to say Kayden takes pride and satisfaction in the quality of work he does, from lawn care to landscaping.
Very professional and more than competitive in pricing!
Great service, super quick to respond and show up. Really appreciated their help. Did a great job.
Had Kayden from Edwards come over to aerate, feed and fertilize our backyard to continue his wonderful work from last year.
Building in Callander this season?
Send the basics and Kayden will get back to you personally, usually the same day during build season. Or call or text (705) 358-1169.
Free quotes. Fixed price in writing after an on-site visit.