Licensed Fully Insured 3-Year Warranty (705) 358-1169 Mon–Fri 7am–6pm Sat–Sun 8am–5pm
Waterfront interlock paver patio built by Edwards Landscape and Construction near North Bay, Ontario
Service Areas

Where Edwards works

North Bay, Muskoka, and the communities in between, up to 150 km out.
Last updated July 2026

Edwards Landscape & Construction is a North Bay landscaping, hardscaping, and construction contractor serving Muskoka and the communities across Northern Ontario, travelling up to 150 km for the right project. That covers Callander, Corbeil, Bonfield, Sturgeon Falls, Mattawa, Burk’s Falls, Huntsville, and the Muskoka lakes. Ground conditions, servicing, and permits change from one town to the next, sometimes within a few kilometres, so every build is set up for the community it sits in. Projects run $2,000 to $50,000 depending on scope, quoted in writing after an on-site visit, and backed by a 3-year workmanship warranty.

Why the town matters

North Bay vs the surrounding communities: what actually changes

A patio is a patio, but the ground under it and the office that permits it are not the same from town to town. Here is the short version of what changes once you leave the city.

North Bay vs the surrounding communities
CommunityWater & sewerWho permits septicWhat it changes on site
North BayMunicipalConservation authorityServiced lots, buried services to locate
CallanderVillage core only, about 780 propertiesConservation authorityMost lots on well and septic, strict rules near the bay
CorbeilNone anywhere in East FerrisConservation authorityEvery layout works around a septic bed
BonfieldNone anywhere in the townshipConservation authorityWell and septic, plus steep-slope lots
MattawaMunicipal in townConservation authorityShallow bedrock, high water table, real flood risk
Sturgeon FallsMunicipal in townConservation authorityNo CA permit regime, sand in town and clay outside it
Burk’s FallsMunicipal in the village onlyConservation authority, Parry Sound officeThree separate offices issue one project’s approvals
HuntsvilleMunicipal in townTown of HuntsvillePlanning permit covers grading, fill, and tree removal
MuskokaNine serviced communities onlyArea municipalityNo conservation authority, and rock close to surface
Community by community

The communities Edwards serves

Nine areas, and genuinely nine different jobs. Each one has its own page covering what changes there.

Landscaping and construction in Muskoka

Muskoka is roughly two hours south of North Bay on Highway 11, and it is the second area Kayden named as primary. It is Canadian Shield country with more than 640 lakes over eight hectares, and roughly two thirds of the district is mapped as bedrock at or near the surface. Rock is a normal part of foundations, driveways, and septic beds here rather than a surprise. Close to 40 percent of Muskoka homes are seasonal, so a great deal of the work is opening, restoring, and finishing cottage property. Muskoka sits outside every conservation authority in Ontario, which means there is no conservation authority permit to pull. Approvals run through the area municipality, the District, and the province instead. The District’s own engineering standards design to a frost depth of 1.5 to 1.8 metres. Read the full Muskoka page.

Landscaping and construction in Huntsville

Huntsville is about 129 km south on Highway 11, roughly an hour and a half, and it is Muskoka’s most populous municipality at 21,147 people. It is also the one place on this list with no zoning by-law at all. In 2023 Huntsville replaced both zoning and site plan control with a Community Planning Permit system that regulates site alteration, grading, fill placement, and vegetation removal across the whole town. A permit is required for any development on a waterfront property, shoreline buffers have to be kept 15 metres deep across at least 75 percent of the lot, and conditions can include a tree preservation plan. Many waterfront owners also do not own the shore road allowance between their lot and the water. The town core sits on sand and gravel outwash that digs easily, while lots a few kilometres out are commonly rock at surface. Read the full Huntsville page.

Landscaping and construction in Sturgeon Falls

Sturgeon Falls is about 40 minutes west on Highway 17. The town is built on a sand and gravel delta the Sturgeon River pushed into glacial Lake Algonquin, roughly seven kilometres by five, with old wind-blown dunes two to five metres high sitting on top of it. Step off the delta and the ground changes to flat, poorly drained silt and clay plains with bedrock knobs poking through. It is the same municipality and two completely different digs. West Nipissing also sits outside any conservation authority, so shoreline and floodplain rules come from the municipality’s own official plan and zoning by-law rather than a conservation authority permit, which catches out contractors used to working in North Bay. On a waterfront lot a natural buffer has to be kept across at least half the lot to a depth of 7.5 metres, and it cannot be lawn. French is the mother tongue of most residents. Read the full Sturgeon Falls page.

Landscaping and construction in Callander

Callander is minutes south of North Bay on Highway 11, and it is the one community here that sits in Parry Sound District rather than Nipissing, while still falling under the North Bay-Mattawa Conservation Authority for both septic and shoreline permits. Municipal water and sewer stop at the urban service area, roughly 780 properties, so most of Callander including much of the waterfront is on private well and septic. Anything within 120 metres of water that drains into Callander Bay faces mandatory septic inspections every five years, because the bay is treated as over capacity for phosphorus. The conservation authority names regrading, filling, hardscape, and retaining walls as work that needs a permit, which surprises most homeowners. Read the full Callander page.

Landscaping and construction in Mattawa

Mattawa is about 60 km east on Highway 17, roughly 45 minutes, where the Mattawa and Ottawa rivers meet in a rift valley. The geology here is documented better than anywhere else on this list. Boreholes drilled downtown for highway work hit gneiss bedrock between 2.9 and 4.3 metres, refused on boulders as shallow as 2.3 metres, and found the water table 1.4 metres down near the rivers. Mattawa also publishes a minimum 1.2 metre depth of bury for deck foundations, which most municipalities do not. Flooding here is current rather than historical: the town declared a state of emergency in 2019 when the Ottawa River rose 4.25 metres, and water passed the major flood threshold again in May 2026. Town lots have municipal water and sewer; everything outside is well and septic. Read the full Mattawa page.

Landscaping and construction in Corbeil

Corbeil is about 20 km east on Highway 94, in the Municipality of East Ferris, sitting on the La Vase River between Trout Lake and Lake Nosbonsing. The single most important fact about working here is that every property in East Ferris is on a private septic system. There is no municipal sewer or water anywhere in the municipality. A renovation that increases a house by 15 percent or more triggers a mandatory conservation authority septic review. In practice that means every patio, driveway, retaining wall, and pool has to be laid out around a septic bed and its setbacks before anything else is decided. Corbeil is also where the Dionne quintuplets were born in 1934, though their doctor practised in Callander and the farmhouse itself now sits on the North Bay waterfront. Read the full Corbeil page.

Landscaping and construction in Bonfield

Bonfield is about 20 minutes east, reached by Highway 531 off Highway 17. Like East Ferris, the township has no municipal water or sewer anywhere within it, so every job runs on private well and septic with conservation authority permits. The province has identified a significant number of lots in Bonfield with steep slopes, which are treated as hazardous sites and can require engineering before anything is built on them. Talon Lake and Kaibuskong Bay were both assessed as at capacity in 2017 and cannot absorb more development without ecological impact. Bonfield also has the fastest per capita growth of any community in the Nipissing district, and construction is one of its largest employing industries. Read the full Bonfield page.

Landscaping and construction in Burk’s Falls

Burk’s Falls is about 90 km south on Highway 11, in the Almaguin Highlands, and it is the one place on this list where a single project can involve three separate offices. The village has no building department of its own, so permits are issued by a Joint Building Committee based in Sundridge that serves seven municipalities. The village signs off zoning compliance separately, and that form has to be submitted with the application or it is deemed incomplete. Septic goes to the conservation authority’s Parry Sound office, which handles septic across the district even where it has no watershed jurisdiction. The village has municipal water and sewer inside its boundary, drawn from the Magnetawan River; step outside and it is well and septic again. Read the full Burk’s Falls page.

North Bay

North Bay is home. Edwards Landscape & Construction is based at 850 Lakeshore Drive and works across the city and its neighbourhoods year round, from West Ferris and Pinewood to the waterfront. Most city lots are on municipal water and sewer, which removes the septic constraint that shapes so much of the surrounding work, and replaces it with buried services that have to be located before anything is dug. Everything on the five service pages is built here first. Read the full North Bay page.

Service area FAQ

Service area questions, answered

01

How far will Edwards Landscape & Construction travel?

Edwards Landscape & Construction travels up to 150 km from North Bay for the right project, covering Callander, Corbeil, Bonfield, Sturgeon Falls, Mattawa, Burk’s Falls, Huntsville, and Muskoka. Larger projects justify longer drives, so the practical answer depends on scope. Call or text (705) 358-1169 to confirm coverage for your address.

02

Do you work on waterfront property?

Yes. Waterfront work is common across this service area, and it carries rules that inland lots do not. Depending on the community, a shoreline buffer may have to stay natural rather than lawn, structures may be set back from the high water mark, and a conservation authority or provincial permit may be needed before any regrading, filling, or retaining wall goes in.

03

Which communities need a conservation authority permit?

North Bay, Callander, Corbeil, Bonfield, and Mattawa fall under the North Bay-Mattawa Conservation Authority, which lists regrading, filling, hardscape, and retaining walls as permit-triggering work near regulated areas. Sturgeon Falls, Huntsville, and Muskoka sit outside any conservation authority, so rules there come from the municipality and the province instead.

04

Does Edwards handle the permits?

Yes. On projects where Edwards Landscape & Construction is the contractor, permits, inspections, and trade coordination are handled as part of the job, so the homeowner deals with one contractor rather than several offices.

05

Is a septic system a factor outside North Bay?

Very often, yes. Every property in East Ferris and every property in Bonfield is on private septic, and outside the serviced cores of Callander, Sturgeon Falls, Mattawa, and Burk’s Falls it is well and septic as well. That changes where a patio, driveway, pool, or retaining wall can physically go, because the bed and its setbacks have to be worked around.

Reputation

Rated 5.0 across 20 Google reviews

5.0 from 20 Google reviews

Kayden did an amazing job on our home renovation! He painted our home and updated our kitchen cabinets, and everything turned out beautifully. He was friendly, professional, and took great pride in his work. I would definitely recommend him to anyone looking for quality work!

Helen NormanJul 2026

The guys did a great job. Very happy with the end result. Highly recommend. Hard workers!

Mandy BastienJul 2026

I'm very proud to say Kayden takes pride and satisfaction in the quality of work he does, from lawn care to landscaping.

RuthAnn BrydgeJul 2024

Very professional and more than competitive in pricing!

Jillian KAug 2025

Great service, super quick to respond and show up. Really appreciated their help. Did a great job.

Caitlin BourqueJan 2026

Had Kayden from Edwards come over to aerate, feed and fertilize our backyard to continue his wonderful work from last year.

Chris BissonnetteMay 2025
Start your project

Tell us where you are.

Send the basics and Kayden will get back to you personally, usually the same day during build season. Or call or text (705) 358-1169.

Request a Quote Call or Text (705) 358-1169

Free quotes. Fixed price in writing after an on-site visit.

Find Us

Based in North Bay, Ontario.

Serving North Bay, Muskoka, and the surrounding communities within 150 km.